Project Braila County

Activ Group Management is present with equipment and machinery in one of the most important infrastructure projects in Romania, a project located in Braila County.

 Along with equipment such as 8×4 dump trucks, excavators, front loaders or Bobcat type equipment, one of the most important categories of equipment on this site is the one for pouring concrete.

 We are present with concrete mixers as well as with concrete pumps with a length that varies between 40 and 42 meters with a maximum pouring capacity of 160 m3 / h.

 For this complex project that includes two anchor blocks with a diameter of 45 meters, it was necessary to pour the molded walls to a depth of 26 meters. There are also tower blocks consisting of two circles with a diameter of almost 27 meters. For each filling layer, 2 meters thick, a quantity of approximately 3000 cubic meters of concrete is required.

 The equipment that is part of this project is made available to the manufacturer together with the servicing staff, who are assisted by technical teams.